Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
澳门太阳城
重庆社区
SKY网络电话
皇冠体育
99手游排行榜
路由器技术网
品牌街 -国美在线
大学生村官之家
威廉希尔亚洲
Chess-and-card-game-info@allegroauctions.net
淄博赶集网
福瑞股份
昆明卫生职业学院
山西传媒学院
知蜂堂官方网站
威客日付网络
西安建设工程信息网
南昌理工学院招生信息网
中瑞药业
北海赶集网
中国工程咨询网
中国投资咨询网
广西大学招生信息网